Hardscapes and Stream Restoration Continue

The soil nail wall should be completed this week. The slopes above the soil nail walls have been grassed and are starting to establish a good stand of grass.

The bollards for the handicap signs have been installed in preparation for the remainder of the concrete sidewalk to be formed and poured.The stream work is ongoing. In this section, the new channels have been graded and temporarily stabilized prior to the stream being diverted to the final location.

Retaining Walls Progress While Interiors Get Finishing Touches

Major segmental walls and tiered gabion basket walls are complete on the site. There are two small segmental walls remaining on the Jett Lanier Drive that ties to the Spine Road which should be getting started in the next couple of weeks.

The soil nail wall is nearing completion. The section of the soil nail wall tying to the gabion basket wall has the upper 5 feet prepped and ready for the shot-crete application.

Lots is happening in the parking area. Concrete sidewalks are being formed and poured. The irrigation system is being installed in islands to prepĀ  for landscaping. Curb and gutter has been completed.

Inside, the vinyl composite tile (VCT) flooring and the carpet have been installed on the sales floor and the office. Both are perfect for high traffic areas.

The Starbuck’s area is taking on a whole new look. Cabinets are in place and the equipment is being installed. Glass counters will finish the space.

The frozen foods section of the store is nearing completion. Our team has placed coolers and freezers throughout the space.