Hardscapes and Stream Restoration Continue

The soil nail wall should be completed this week. The slopes above the soil nail walls have been grassed and are starting to establish a good stand of grass.

The bollards for the handicap signs have been installed in preparation for the remainder of the concrete sidewalk to be formed and poured.The stream work is ongoing. In this section, the new channels have been graded and temporarily stabilized prior to the stream being diverted to the final location.