Street and Parking Lot Work Nears Completion

Our team has completed final paving on the Spine Road and the guardrail has been installed. Work on street lights and tree plantings is progressing.

In preparation for the new traffic light at the Franklin Road intersection, signal poles have been installed.

Striping and signing are complete in the parking lot. We have also paved the Cox Road entrance and temporarily striped there.

In the floodplain areas, we have finished the plantings.

 

Paint & Paving at Gastonia

 

Loader spreading stone before paving

North driveway getting the binder asphalt placed.

Stone crews did the final grading and compacting for the north driveway. The drive is tested and once it passes, the asphalt binder is placed.

Service drive after paving

A view of the north driveway from the loading dock

Crews placed the asphalt binder along the north service roads towards the loading dock. In addition, paving was done along the areas near the main entrances.

Concrete crews working on sidewalks

After the weather event last week, concrete crews were able to make pours for the front sidewalk areas. Despite the weather being stubborn, the crews have made great progress.

Loading Docks Shown here

The back area of the building is nearing completion as well. All areas have been primed and painted. In addition, the concrete crews have finished the back side walk pours.

Arches and basket wall shown

Crews are up to the top of the arches with the basket walls.  They have 8 more feet to the top of the wall.

Wiring for ceiling grid shown.

The interior work is progressing as well. Ceiling grid wires have been started and we plan to continue with ceiling grid installation on 5/18/11.

Drywall on sales floor shown taped and bedded.

Walls shown after mudding and tape process

The interior walls were taped and mudded after metal studs were completed last week. Here the walls are shown after this process; ready for final sanding and primer.